Skip to content

Pacific Gas and Electric Company · Corporate

Pacific Gas and Electric Company: bankruptcy, 2019

Pacific Gas and Electric Company: bankruptcy credit event on 2019-01-29, worked through from its SEC filings. The 2.95% Senior Notes due March 1, 2026 (CUSIP 694308HP5) are a Deliverable Obligation: all 7 checks pass. Each result cites the clause behind it, or says when it rests on the absence of a clause.

1 instrument · 8 questions · 3 documents
LinkedInXEmail

Verified answerPacific Gas and Electric Company · Bankruptcy · 2019

Is the instrument a Deliverable Obligation for this credit event, on 7 checks: the issuer is the Reference Entity; the Maximum Maturity (30 years), Specified Currency, Not Subordinated, Not Bearer and Transferable characteristics; and Not Contingent?

Yes, deliverable

2.95% Senior Notes due March 1, 2026 pass all 7 checks, each tied to its clause.

7 of 7 checks pass
See the 7 checks

What CDSBench does

  • Your bonds, checked

    Upload the indenture and get this page for your own position.

  • Before and when

    Ready before a credit story breaks, and the moment it does.

  • Every answer sourced

    Clause-level evidence you can show a committee.

Credit event
Bankruptcy · 2019-01-29
Entity type
Corporate

Instruments

Each obligation has its own page with terms and questions.

Questions and verified answers

Open a question for the verified answer, its basis and how it was checked. Clause links open the documents below.

  1. #1 Is the instrument a Deliverable Obligation for this credit event, on 7 checks: the issuer is the Reference Entity; the Maximum Maturity (30 years), Specified Currency, Not Subordinated, Not Bearer and Transferable characteristics; and Not Contingent?
    Eligible
  2. #2 Does the instrument meet the Maximum Maturity characteristic (30 years)?
    Yes

    Twenty-Seventh Supplemental Indenture of 2016-03-01

  3. #3 Does the instrument meet the Specified Currency characteristic (USD, EUR, JPY, GBP, CHF, CAD)?
    Yes

    Twenty-Seventh Supplemental Indenture of 2016-03-01

  4. #4 Does the instrument meet the Not Subordinated characteristic?
    Yes
  5. #5 Does the instrument meet the Not Bearer characteristic?
    Yes

    Amended and Restated Indenture of 2005-04-22

  6. #6 Is the instrument Not Contingent (principal not reducible for a reason other than payment)?
    Yes
    None: no clause making principal contingent was found.
  7. #7 Does the instrument meet the Transferable characteristic?
    Yes
    None: no clause restricting transfer was found.
  8. #8 Is the issuer of the instrument the Reference Entity?
    Yes

    Twenty-Seventh Supplemental Indenture of 2016-03-01

Documents

The case record. 8 sections support the verified answers.

  • DOC-1 PG&E Corporation / Pacific Gas and Electric Company 8-K filed 2019-01-29, Item 1.03 Bankruptcy (and Item 2.04), petition 2019-01-29excerpts
  • DOC-2 Twenty-Seventh Supplemental Indenture dated March 1, 2016, 2.95% Senior Notes due March 1, 2026 (EX-4.1)excerpts
  • DOC-3 Amended and Restated Indenture dated April 22, 2005, Pacific Gas and Electric Company (base indenture, EX-4.1 to the Q1 2005 Form 10-Q)excerpts

Timeline

  1. 2016-03-01Twenty-Seventh Supplemental Indenture for the 2.95% Senior Notes due March 1, 2026 (filed as Exhibit 4.1), under the indenture of 22 April 2005.
  2. 2019-01-29PG&E Corporation and Pacific Gas and Electric Company file voluntary Chapter 11 petitions in the U.S. Bankruptcy Court for the Northern District of California.

Mastermind

Analyse your own bond like this

Upload the documents for a bond you hold or are looking at. Mastermind runs the same deliverability checks and ties every conclusion to its clause: useful before a credit story breaks, and the moment it does.

Private analysis requires Mastermind Pro ($499 / month); the price is shown before any checkout.