Model failure · United Provinces of Kestrel 2027 · JPY 2040 Notes · CDSBench #82 · benchmark v0.1
Gemini reached the verified outcome but cited the wrong section
Question
Does the instrument's maturity satisfy a maximum maturity of 30 years measured from the credit event date (2027-09-25)?
- Verified answer
- Yes Maturity 2040-09-25 vs limit 2057-09-25.
- Gemini answered
- Yes Based on the maturityDate provision, the answer is YES.
- Decisive issue
- Maturity
- Evidence for the label
- Gemini cited
- evidence score 0%
Failure classification
Evidence selection failure
- Evidence selection failure. Correct answer but cited evidence does not match the supporting sections (evidence score 0.00).
Classifications are produced by the failure analyzer against the verified label and the evidence map; the model never grades itself. Failure taxonomy →
Everyone else
The same question, every other participant
- MastermindCorrectanswered Yes
- ClaudeCorrectanswered Yes
- GPTCorrectanswered Yesits failure page →
Related failures
No other maturity misses on this run
Benchmark version
v0.1
This page records Gemini’s answer from its latest official run on the frozen benchmark v0.1. If the model is re-run and the answer changes, the page shows the new result and the model page keeps the full run history. Corrections policy →
Same kind of question on your own documents?
Mastermind runs the deterministic tests, the skeptic and the evidence verification on your record. Private documents never enter the benchmark.
Analyze your own documents →